meirungroup
cn   en
 
 |  Company    |  Product  |  Sunshine Studio  |  Insulation Material  |  Brochure&Info  |  FAQ  |  Contact | Group Enterprise
 
 
            Sunshine Studio        
 
 

Meirun Sunshine Studio

Can you imagine what kinds of miracles created for Meirun solar energy by a team with a group of young people as the backbone, which average age less than 28-year-old, within a short period of one year and three months?

Read the following data please:

Completed 12,000 ㎡AAA international Standardization manufacturing plant within ten months and six days;
From designing the first equipment drawings to finish the testing of product lines, we only spent 163 days;
Completed the absorber plate trial work with Alanod German Company in 3 months; finished the special insulation material research and test work within 70days;
From establishing the e-commerce platform to put the advanced online database features into use, we only spent 120days.
And our dream of Meirun own flat plate solar collector from concept to reality within one year and three months.
Maybe it still can not explain eveything
When Mr Martin, the technical manager of Alanod in China visit our factory the second time, he only said one sentence: "inconceivable, only you Chinese people can create such a miracle."

Ceramic production lines all delivery Meirun Group for Himin Group

The beginning of 2008, Through three months of difficult negotiations and from the scene of numerous technical exchanges, our Group with Himin Group reached cooperation agreements.
We produce intelligent automatic pressure tanks enamel production line for Himin Group.
Solar water tanks line which used a number of domestic production line of Intelligent Automation-class production technology, from producation to test full automatic data monitoring,
and all the processes from the computer. the production moves with Siemens (PLC) operation.
Meirun companies struggle to three months in early August, all the equipment have been installed in place once, praise by Himin’s leaders, at the same time saving more than a million yuan for Himin.

2008 international solar fair please waiting

On Sep 20-23,2008 The second session china solar festival and the sixth session china international solar fair will be hold in Changzhou International Exhibition Center. And Meirun group cost a lot of money and had the biggest boosts. All draft was supplied and designed by Shanghai ACMP Exhibition.at the same time, ACMP and Meirun group sign the Long-term cooperation letter of intents.that means Meirun flat plate solar energy come into solar industry, and directorate decide we will tank part in the jinan solar fair and intersolar fair next year.
Meirun group will be in the W-16 144 square meter brilliant appearance. product launchs will be in this place. Welcome customers and craft brothers visit the scene.

Sunshine studio into the sixth anniversary celebrations

On 28 march 2008,Meirun group hold a party for celebrate sunshine studio come into existence sixth anniversary, begin in the congratulation of Mr Xu runlong the chairman of Meirun group. When the Gao hongfu(CTO) lift the model of flat plate solar collector in the front of chairman’s desk, we all delight, excite, and we fought 180 days for it.
That mean this flat plate solar collector is a new concept and can used in all weather and all latitude, designed by Meirun, produced by Meirun.

meirun to contribute to industry-standard flat plate solar collector

on 2 oct Aug 2008.Meirun group demands meirun solar to devote all technology data t china solar water heater industry-standard, and take part in the draft of solar water heater standard. So Meirun set up six special item teams, by James charge and Coordinate with solar committee. Do contribution for solar water heater industry, at the same time, for consumer buy a high Cost-effective products to do a promise.

Signing ceremony between Meirun group and Ping An Insurance Group

Signing ceremony between Meirun group and Ping An Insurance Group come to a successful conclusion
At 10:00 on August 8, 2008 8 pm, the signing ceremony of Meirun group and Ping An Insurance group were held at Meirun meeting room. The Chairman Mr Xu Runlong, Assistant chairman Mr Pan She of Meirun group, the general manager MS Yu Yifeng,the marketing manager Mr Gao Jirong and their party attend the ceremony. And it was witnessed by the professional media of solar industry, Darmei International Advisory. Since then, the flat plate solar collector is insured by Meirun group at the beginning of producing.
Through the ceremony, Meirun group express their high-profile on the quality, and will make perfect in subsequent manufacturing process!